skip to Main Content

Belrose Waste Management - Waste Asset Management Corporation

TYPE of WORK

Construction of Access Road

PIPE DETAIL

Construction of a dedicated vehicle access and pedestrian / cycle way to the Bare Creek Bike Park facility as follows:

Crozier Road

  • Provide all necessary surveys set outs and supply of As Built plans upon completion for all works
  • Installation of concrete kerb (for dedicated shared pedestrian / cyclist)
  • Removal of existing road line marking and installation of new line marking
  • Road expansion (near entrance to Suez facility) – decommissioning of existing kerb and gutter, excavation and fill placement of expanded road section
  • Speed hump to be adjusted to suite dedicated cycle path and pedestrian walkway as required
  • Stormwater drain on the corner of the road to be extended and relocated as required.
  • Investigate the stormwater connection to determine pipe sizing etc.
  • Manage all traffic and safety of Suez customers and the public
  • Conduct all necessary Dial Before You Dig and protect all known services.
  • Disposal of surplus excavated material on site (verified by WAMC)
  • All general waste to be disposed of appropriately in the 10m3 waste bin that has been provided on site.

Access Road – Former Weighbridge (CH 0.00 to 140)

  • Provide all necessary surveys set outs and supply of As Built plans upon completion for all works
  • Clearing and grubbing, vegetation (trees to be mulched) and left on site
  • Manage works around existing services including working under overhead power line (AusGrid)
  • Removal of fencing and reinstate fencing following completed works (new fencing)
  • Cut and fill as required
  • Compact and prepare necessary subgrade
  • Supply and placement of road surface
  • Widening of existing Suez Access Road (CH 70 to 120)
2020
2020

Shiralee Creek Gravity Sewer - Main Orange City Council

TYPE of WORK

Sewer

PIPE DETAIL

Construction of Gravity Sewer Main (approximately 3,460m) which includes:

  • Approximately 1,393m of DN300 UPVC gravity sewer main including
  • 50m of DN300 Underbore through embankment
  • 2 x 42m of DN300 Underbore across the railway corridor
  • road crossing of Woodward Street by open trenching
  • Approximately 1,318m of DN225 UPVC gravity sewer main including waterway crossing
  • Approximately 248m of DN150 UPVC gravity sewer main
  • Construction of 42 x Manholes (ranging from 0m to 4.5m in depth)
  • Construction of 4 x Manholes (ranging from 3m to 6m in depth)
  • Install sewer junction
  • Install subsurface drainage consisting of:
  • approximately 255m of DN150 UPVC drain line
  • approximately 243m of DN100 UPVC drain line
  • Reinstate all fencing
  • Install rural gates with associated fittings
  • Placement of 2 waterproofing bulkheads
  • Testing & Connections
  • Hydroseeding and rehabilitation of all disturbed soil areas

Romney Street, Elderslie - Western Earthmoving Pty Ltd

TYPE of WORK

Sewer & Water

PIPE DETAIL

Sewer:

  • Construction of approximately75m of 150mm PVC sewer pipeline (20m concrete encased)
  • Construction of 1 x TMS
  • Construction of 1 x MS

Water:

  • Construction of approximately 27m of 100mm PVC water pipeline
  • Construction of 9 x Main to Meter (long)
  • Remove disused pipe

Testing

Sewer & Water Connections

 

2019
2019

Brooking Avenue, Elderslie Western Earthmoving Pty Ltd

TYPE of WORK

Water & Sewer

PIPE DETAIL

Sewer:

  • Construciton of approximately143m of 150mm PVC
  • Construction of approximately 16m of 100mm PVC
  • Testing
  • Connection

Water:

  • 13 x Short House Service Connecitons
  • 3 x Long House Service Connections

Camden Valley Way, Elderslie Burton Contractors

TYPE of WORK

Water & Sewer

PIPE DETAIL

Watermain:  Construction of approximately 270m of pipeline including:

  • approximately 68m of OD560 PE pipeline
  • approximately 32m of OD315 PE pipeline
  • approximately 12m of OD180 PE pipeline
  • approximately 3m of DN150 DICL pipeline
  • approximately 129m of DN250 DICL pipeline
  • approximately 6m of DN450 DICL pipeline
  • approximately 20m of OD180 PE pipeline by boring
  • Testing & Connections

Concrete Encasement of Existing Sewer: Construction includes: 

  • Concrete encasement of approximately 33m of existing 300mm sewer
  • Concrete encasement of approximately 5m of existing 450mm sewer
  • Concrete encasement of approximately 5m of existing 500mm sewer
  • Raising of 3 x manhole lids

 

2018
2018

Fairway Drive, Kellyville - RB Plumbing Services Pty Ltd

TYPE of WORK

Water, Recycled Water, Sewer

PIPE DETAIL

Water:

  • 176m of 200mm DICL water pipeline via open trenching

Recycled Water:

  • 176m of 150mm PVC recycled water pipeline via open trenching

Sewer:

  • 108m of 150mm PVC sewer pipeline via open trenching

Survey

Testing

Connections

Fairway Drive, Kellyville RB Plumbing Services Pty Ltd - 32 Boundary Road, Schofields Western Earthmoving

TYPE of WORK

Potable Watermain Extension

PIPE DETAIL

Construction of approximately 403m of water pipeline consisting of:

  • 395m of 100mm PVC pipeline
  • 5m of 100mm DICL pipeline
  • crossing under stormwater
  • concrete surround
  • 30 x Mains to Meter (9 by under road bore)
  • Testing & Connection
2017
2017

Spring Farm Residential Development UrbanGrowth NSW

TYPE of WORK

Lead-In Sewer Main

PIPE DETAIL

Construction of approximately 880m of PE sewer pipeline consisting of:

  • 704m of DN355mm PE100 sewer main by under boring
  • 64m of DN355mm PE100 sewer main by open trenching
  • 93m of DN280mm PE100 sewer main by under boring
  • 19m of DN280mm PE100 sewer main by open trenching
  • 2 x 3m-4m deep MHs
  • 2 x 4m-5m deep MHs
  • 3 x 5m-6m deep MHs
  • 1 x 6m-7m deep MH
  • 1 x 7m-8m deep MH
  • 1 x 3m-4.5m deep MS
  • Testing & Connection

 

Spring Farm Residential Development UrbanGrowth NSW

TYPE of WORK

Lead-In Sewer Main

PIPE DETAIL

Construction of approximately 880m of PE sewer pipeline consisting of:

  • 704m of DN355mm PE100 sewer main by under boring
  • 64m of DN355mm PE100 sewer main by open trenching
  • 93m of DN280mm PE100 sewer main by under boring
  • 19m of DN280mm PE100 sewer main by open trenching
  • 2 x 3m-4m deep MHs
  • 2 x 4m-5m deep MHs
  • 3 x 5m-6m deep MHs
  • 1 x 6m-7m deep MH
  • 1 x 7m-8m deep MH
  • 1 x 3m-4.5m deep MS
  • Testing & Connection

 

2017
2017

Spring Farm Residential Development

TYPE of WORK

Lead-In Sewer Main

PIPE DETAIL

Construction of approximately 880m of PE100 sewer pipeline consisting of:

  • Approx 704m of DN355mm PE100 sewer main by under boring
  • Approx 64m of DN355mm PE100 sewer main by open trenching
  • Approx 93m of DN280mm PE100 sewer main by under boring
  • Approx 19m of DN280mm PE100 sewer main by open trenching
  • 2 x 3m-4m deep MHs
  • 2 x 4m-5m deep MHs
  • 3 x 5m-6m deep MHs
  • 1 x 6m-7m deep MH
  • 1 x 7m-8m deep MH
  • 1 x 3m-4.5m deep MS
  • Testing & Connection

Pacific Highway Upgrade, Ourimbah CMC

TYPE of WORK

Sewer & Water

PIPE DETAIL

Construction of approximately 1,080m of sewer & water pipeline consisting of:

  • Approx 846m of 100mm ; 150mm & 225mm PVC pipeline
  • Approx152m of 150mm & 250mm DICL pipeline
  • Approx 82m of 278mm & 508mm SCL pipeline
  • Approx 19m of concrete encasement
  • Underboring
  • 2 x Bore pits
  • 6 x Precast Manholes (1.4m to 3.5m)
  • 19 x Mains to Meter
  • Sewer & WaterTesting
  • Sewer & Water Connection

 

2016
2016

Sydney Olympic Park Leachate Rising Main Sydney Olympic Park Authority

PIPE DETAIL

  • The construction of 7 (seven) Flushing Points approximately 300m apart along the existing DN90mm HDPE Pipeline. The locations are tentatively chosen at Ch18.94, 348.36, 650, 950, 1250, 1550 & 1710.8.  Isolating Valves will be installed on either side of the Flushing Point.
  • The cleaning of the DN90mm HDPE Leachate Pipeline by high pressure jetting.
  • The flushing of the DN90mm HDPE Leachate Pipeline.

 

 

Belrose Landfill Leachate Transfer Main Waste Asset Management Corporation

TYPE of WORK

Leachate Rising Main

PIPE DETAIL

Construction of approximately 1,282mof pipeline consisting of:

  • Installation of approx 231m of 180mm PE pipeline between LTP Bund Wall and Weighbridge (including road crossing)
  • Installation of approx 1051m of 180mm PE pipeline between Weighbridge and Wyatt Ave Connection Point (including road crossings)
  • Valve Pit Construction

Connections

 

2015
2015

Remembrance Driveway, Tahmoor Zinfra Group

TYPE of WORK

Water

PIPE DETAIL

Construction of approximately 285m of DN180 PE pipeline including:

  • 20 x Reconnection of existing property services
  • Testing
  • Connection

Glenmore Park SP1189 Abergeldie Complex Infrastructure

TYPE of WORK

  • Sewer Pressure Main
  • Sewer Gravity Main
  • Temp Water Main

PIPE DETAIL

Sewer Pressure Main:

Construction of approximately 1096m of pipeline consisting of:

  • 1068m of 180mm PE100 pipeline
  • 5m of 300mm UPVC pipeline
  • 2 x Cast-in-situ Manholes
  • 1 x Induct Ventshaft
  • 1 x Educt Ventshaft

Sewer Gravity Main:

  • Construction of approximately 52m of 300mm UPVC pipeline
  • 2 x Cast-in-situ Manholes

Temporary Water Main:

  • Construction of approximately 1084m of 125mm PE100 pipeline

Testing

Connection

 

2015
2015

Orphir Street Carrier Extension Abergeldie Complex Infrastructure

TYPE of WORK

Trunk Sewer

PIPE DETAIL

Construction of approximately 3,100m of Sewer pipeline consisting of:

  • Installation of approximately 1,070m of 450mm PP pipeline by open trench excavation
  • Installation of approximately 250m of 450mm PP pipeline by boring (to cross beneath the M4 Western Motorway)
  • Installation of approximately 1,700m of 375mm PP pipeline by open trench excavation
  • Installation of approximately 80m of 375mm PP pipeline by boring (to cross beneath the Erskine Park Link Road)
  • Testing
  • Connection

Riverstone Road, Riverstone

TYPE of WORK

Sewer Lead-In

PIPE DETAIL

Construction of approximately 153m of sewer pipeline consisting of:

  • approximately 153m of 225mm PVC pipeline
  • 3 x Maintenance Shafts
  • 1 x Manhole
  • Testing
  • Connection
  • Hydroseeding
2015
2014

Richmond Rd, Colebee Abergeldie Complex Infrastructure

TYPE of WORK

Sewer Pressure Main

PIPE DETAIL

Construction of approximately 1,064m of PE 100 pressure sewer main including:

  • approximately 650m of 200mm PE100 pipeline (Butt welded)
  • approximately 414m of 250mm PE100 pipeline (Butt welded)
  • Testing
  • Connection

 

Richmond Road, Marsden Park Thiess Services Pty Ltd

TYPE of WORK

Watermain Extension

PIPE DETAIL

Construction of approximately 3,768m of Potable Watermain along Richmond Road including:

  • approximately 1,198m of OD560 PE100 pipeline (Butt welded)
  • approximately 2,209m of 450mm DICL pipeline (RRJ & FL Joint)
  • approximately 359m of 375mm DICL pipeline (RRJ & FL Joint)
  • approximately 0.6m of 150mm DICL pipeline (RRJ & FL Joint)
  • approximately 1.8m of 100mm DICL pipeline (RRJ & FL Joint)
  • Testing
  • Connection

 

2014
2014

Fitzroy Street, Leura Tee & Beer

TYPE of WORK

Sewer & Main to Meter

PIPE DETAIL

Construction of approximately 188m of sewer pipeline including:

  • approximately 188m of 150mm UPVC
  • 2 x Manholes
  • 1 x Terminal Maintenance Shaft
  • 3 x Maintenance Shafts
  • 5 x Main to Meter
  • Testing
  • Sewer Connection

 

Martin Place, Mortdale - Rainbow Group Pty Ltd

TYPE of WORK

Watermain Amplification

PIPE DETAIL

Construction of approximately 224m of water pipeline consisting of:

  • 104m of 300mm mPVC pipeline
  • 5m of 200mm mPVC pipeline
  • 91m of 150mm mPVC pipeline
  • 10m of 100mm mPVC pipeline
  • 14m of 150mm SCL pipeline (concrete encased)
  • 3 x Property service connections
  • Testing
  • Connection to existing system

 

2014
2013

Woodville Street, Hurstville - Icon Constructions Pty Ltd

TYPE of WORK

Watermain Amplification

PIPE DETAIL

Construction of approximately 203m of water pipeline consisting of:

  • 161m of 200mm mPVC pipeline
  • 16m of 150mm mPVC pipeline
  • 14m of 100mm mPVC pipeline
  • 12m of 200mm DICL pipeline
  • 7 x Property Service Connections
  • Installation of 1 x 200mm stop valve
  • Installation of 1 x 150mm stop valve
  • Testing
  • Connection to existing system

Manly Hydraulics Laboratory NSW Government Public Works

TYPE of WORK

Water Supply Upgrade

PIPE DETAIL

Construction of approximately 230m of water pipeline consisting of:

  • 230m of 500mm DICL pipeline comprising a combination of aboveground and below ground sections.
  • 3 x 500mm butterfly valves
  • 1 x 450mm butterfly valve
  • 2 x 150mm air valves
  • 2 x 150mm scour valves
  • 1 x 300mm gate valve
  • 1 x 375mm gate valve
  • Testing
  • Connection

 

2013
2013

Wilson Street, Botany Toplace Pty Ltd

TYPE of WORK

Watermain Amplification & Extension

PIPE DETAIL

Construction of approximately 66m of water pipeline consisting of:

  • 66m of 200mm DICL pipeline
  • 5 x Property Service Connections/Transfer of Services
  • Pressure Testing
  • Connection

Albert Avenue, Chatswood Iglu No 202 Pty Ltd

TYPE of WORK

Watermain Amplification

PIPE DETAIL

Construction of approximately 170m  of water pipeline consisting of:

  • 170m of 200mm DICL pipeline
  • Main to Meter Services
  • Fire Service Transfers
  • Testing

Connection to existing system

2013
2013

Wet N Wild Leisure Park Lipman Pty Ltd

TYPE of WORK

  • Sewer
  • Water

PIPE DETAIL

  • 114m of 150mm PP
  • 590m of 225mm PP
  • 92m by Underroad Boring
  • 59m of 300mm PP Underroad Boring
  • Concrete enc of 15m of 150mm PP
  • Concrete enc of 25m of 225mm PP
  • 7 Maintenance Holes
  • 4 Maintenance Shafts
  • 1 Terminal Maintenance Shaft
  • 605m of 250mm PVC water pipeline
  • 3m of 250mm DICLP water pipeline

Jarvisfield Estate, Picton Mullally Constructions

TYPE of WORK

Sewer Pressure Main

PIPE DETAIL

  • 520m of 100mm DICACL
  • 20m of 150mm Upvc
2012
2012

Harrington Park Watermain Lead - In MBark Pty Ltd

TYPE of WORK

Watermain

PIPE DETAIL

  • 3179m of 200mm uPVC
  • 70.4m of 200mm SCL
  • Underroad Boring
  • Creek Crossing

Caddens Release Landcom

TYPE of WORK

Sewer Carrier Main

PIPE DETAIL

  • 953m of 450mm PP
  • 72m by microtunneling
  • 301m concrete encased
  • 180m of 375mm PP by microtunneling
  • 14 Maintenance Holes
  • 97.5m x 700mm Auger Bore
2012
2012

Macpherson Street, Warriewood Meriton Apartments

TYPE of WORK

Sewer  Reticulation

PIPE DETAIL

  • 116m of 150mm UPVC
  • 539m of 225mm UPVC
  • 14 Manholes
  • 2 Maintenance Shafts

Bingara Gorge Cleary Bros

TYPE of WORK

  • Pressure Sewer
  • Potable Water
  • Recycled Water

PIPE DETAIL

  • 290m of 40mm PE
  • 310m of 50mm PE
  • 37m of 100mm PVCP
  • 225m of 150mm PVCP
  • 278m of 100mm PVCP

 

2011 - 2012
2011 - 2012

Gulgong Parks Irrigation Scheme Mid - Western Regional Council

TYPE of WORK

  • Potable Water RM
  • Irrigation Water GM

PIPE DETAIL

  • 2,970m of 250mm DICL
  • 960m of 200mm PVC
  • 710m of 150mm PVC
  • 139m of 100mm PVC
  • 1,507m of 100mm PVC

Hughes St, Leumeah - Arenco (NSW) Pty Ltd

TYPE of WORK

Watermain

PIPE DETAIL

  • 66m of 600mm RC Jacking Pipe
  • 70m of 400mm PE 100mm
  • 21m of 300mm DICL
  • 15m of 200mm DICL
  • 60m of 600mm RCJP by boring
2011
2011

Lawson Clean Technology Park Project - Blue Mountains City Council

TYPE of WORK

Sewer Extension

PIPE DETAIL

  • 835m of 225mm VCP
  • Construct 12 MH
  • Install 4 Maintenance Shafts
  • Install 4 Terminal Maintenance Shafts

Pitt Street, Merrylands (Stockland Mall) Quick Plumbing

TYPE of WORK

Sewer

PIPE DETAIL

  • 162m of 375mm Sewer-Max
  • Concrete encase 162m
  •   16m of 600mm SC by boring
2011
2010

Mahogany Precinct, Macquarie Fields - Housing NSW

TYPE of WORK

Stormwater

PIPE DETAIL

  • 65m of 375mm RC
  • 200m of 225mm UPVC
  • 205m of 150mm UPVC
  • 20 x 350x350x350mm concrete/ plastic pits with grate & screen
  • 5 x 450x450x450mm concrete pits with grate and screen
  • 25 x 600x600x600mm concrete pits with grate and screen
  • 4 x 600x600x600mm grated gully pits with kerb inlet pit
  • 3 x 900x900x900mm concrete pits with grate and screen

Birch Precinct, Macquarie Fields - Housing NSW

TYPE of WORK

Stormwater

PIPE DETAIL

  • 110m of 375mm RC
  • 120m of 150mm UPVC
  • 60 x 350x350x350mm plastic pits with grate and screen
  • 25 x 450x450x450mm concrete pits with grate and screen
  • 5 x 600x600x600mm concrete pits with grate and screen
2010
2010

Mudgee Sewerage Augmentation Mid-Western Regional Council

TYPE of WORK

  • Sewer Rising Main
  • Sewer Gravity
  • Precast Manholes
  • River Crossing

PIPE DETAIL

  • 2,765m of 500mm DICL

  • 35m of 450mm DICL

  • Install 450mm stop valves & pits

  • Construct RC vented valve chamber

  • Highway Crossing – thrust bore

  • 33m of 1050mm RCJP by Bothar Boring

  • Railway Crossing – thrust bore

  • 30m of 900mm RCJP by Bothar Boring

  • 3,150m of 600mm SewerMAX

  • 37m of 600mm RCP

  • Highway Crossing – thrust bore

  • 33m of 1050mm RCJP by Bothar Boring

  • Railway Crossing – thrust bore

  • 32m of 1050mm SC by Bothar Boring

  • 4 x 0m to 1.5m deep (1500)

  • 3 x 0m to 1.5m deep (1800)

  • 20 x 1.5m to 3.0m deep (1500)

  • 5 x 1.5m to 3.0m deep (1800)

  • 2 x Greater than 3.0m deep (1800)

  • 20m of 500mm DICL (concrete encased)

HWC Flowmeters Hunter Water Corporation

TYPE of WORK

  • Flowmeters & Valves
  • Belmont 1 & 2
  • Wangi
  • Mayfield West 1
  • Fennel Bay 1
  • Cardiff 1, 2 & 3
  • Mt Hutton 1 & 2
  • Windale 1 & 2
  • Jewells 1
  • Belmont Nth 1 & 2
  • Edgeworth 1 & 2
  • Adamstown 1
  • Newcastle 1
  • Lambton 1
  • Valentine 1
  • Bellbird 1
  • Raymond Terrace 1
  • Kooragang 1

PIPE DETAIL

  • Various locations
  • 375mm & 500mm CICL
  • 375mm CICL
  • 500 mm CICL
  • 600mm DICL
  • 375mm CICL
  • 375mm CICL
  • 500mm CICL
  • 200mm CICL
  • 300mm & 375mm CICL
  • 250mm CICL & 500mm MSCL
  • DN250 Flowmeter
  • DN200 Flowmeter
  • DN400 Flowmeter
  • DN200 Flowmeter
  • DN250 Flowmeter
  • DN250 Flowmeter
  • DN600 Flowmete
2010 - 2011
2009 - 2010

Yarran Pl, Macquarie Fields - NSW Land and Housing

TYPE of WORK

Stormwater

PIPE DETAIL

  • 240m of 150mm stormwater
  • 60m of 225mm stormwater
  • 12m of RHS 200
  • Construction of 15 pits 450x450x450mm with grates, screens and locks
  • Construction of 3 pits 300x300mm with grates, screens and locks
  • Connect downpipes to CDL pits or kerb outlets

Celtis Pl, Macquarie Fields - NSW Land and Housing

TYPE of WORK

Stormwater

PIPE DETAIL

  • Rehabilitation & Reconstruction of 9 inlet pits (600x600x600mm)
  • Construction of 7 pits (450x450x450mm)
  • Construction of 1 pit (900x450x600mm)
  • 100m of 150mm stormwater
  • Construction of 23m of 3000mm wide x 250mm high channels
  • Construction of 135m of 2500mm wide x 300mm high channels
  • Construction of 105m of 2000mm wide x 250mm high channels
2009
2009 - 2010

Cowpasture Road, Green Valley Cut & Fill Pty LtdCowpasture Road, Green Valley - Cut & Fill Pty Ltd

TYPE of WORK

Watermain Adjustment

PIPE DETAIL

  • 721m of 150mm uPVC
  • 80m of 508mm SCL
  • 90m of 559mm SCL
  • 35m of 648mm SCL
  • 50m of 150mm DICL
  • 10m of 250mm DICL
  • 10m of 300mm DICL
  • 90m of 375mm DICL
  • 270m of 450mm DICL
  • 330m of 500mm DICL
  • 125m of 600mm DICL

Blackwattle Bay Sewer

TYPE of WORK

Sewer / Stormwater Separation

PIPE DETAIL

  • 118m of 375mm PVCP
  • 1040m of 300mm PVCP
  • 194m of 225mm PVCP
  • 13m of 150mm PVCP
  • 9m of 450mm RCP
  • 17m of 375mm RCP
2009
2009

Devonshire & Clisdell Sts Department of Housing

TYPE of WORK

Sewer Service Improvement

PIPE DETAIL

  • Replacement of 9 existing sewer pipelines and removal of 4 disused pipelines

Boyce Rd, Maroubra Europa Constructions Solutions

TYPE of WORK

Watermain Amplification

PIPE DETAIl

  • 198m of 200mm DICL

     

  • 10m of 100mm DICL

2008
2008

Auburn Health Service Quick Plumbing

TYPE of WORK

Watermain

PIPE DETAIl

  • 478m of 150mm DICL
  • 3m of 150mm SCL
  • 93m of UPVC pipes

 

Eastern Creek Leachate Pipeline WSN Environmental Solutions

TYPE of WORK

Sewer

PIPE DETAIl

  • 4km of 110mm HDPE- approx 470m in Directional

2008
2008

Beamish St, Campsie Woolworths Ltd

TYPE of WORKWatermain AmplificationPIPE DETAIL
  • 760m of 250mm UPVC
  • 6m of 150mm UPVC

Various Locations – Package 4 Networks Alliance

TYPE of WORK

Flowmeters

PIPE DETAIL

  • Installation of Flowmeters
2008
2007

Herbert St, Kingswood

TYPE of WORK

Trunk Mains

PIPE DETAIL

  • 375mm PE pipe

Cawarra St, Eastern Ck

TYPE of WORK

Trunk Mains

PIPE DETAIL

  • 707m of 300mm oPVC
2007
2007

Cleveland Street

TYPE of WORK

Trunk Mains

PIPE DETAIL

  • 13m of 100mm DICL
  • 23m of 150mm DICL
  • 38m of 200mm DICL
  • 26m of 250mm DICL
  • 14m of 300mm DICL
  • 13m of 375mm DICL
  • 45m of 150mm SCL
  • 25m of 200mm SCL
  • 25m of 300mm SCL
  • 69m of 180mm PE

Abercrombie Street Networks Alliance

TYPE of WORK

Trunk Mains

PIPE DETAIL

  • 460m of 450mm PE

  • 50m of 150mm DICL

2007
2007

Prospect Hill Networks Alliance

TYPE of WORK

PRV Pits

PIPE DETAIL

  • Installation of Pressure Reducing Valves

ECRL (Epping to Chatswood Rail Link) - Transport Infrastructure

TYPE of WORK

Watermain Amplifications, Link Mains & Associated Works

PIPE DETAIL

  • 17m of 100mm PVC
  • 360m of 150mm PVC
  • 1422m of 200mm PVC
  • 423m of 250mm PVC
  • 7m of 150mm SCL
  • 18m of 200mm SCL
  • 30m of 250mm SCL
  • 7m of 150mm DICL
  • 66m of 200mm DICL
  • 14m of 250mm DICL
2007
2006 - 2007

West Camden STP Recycled Water Pipeline Sydney Water

TYPE of WORKRecycled WaterPIPE DETAIL
  • 8,500m of 300mm PVC
  • (72m Boring through soil)

Middleton Grange, Hoxton Park Landcom

TYPE of WORK

Sewer Carrier Main

PIPE DETAIL

  • 194m of 450mm S-Max
  • 985m of 375mm PVC
  • 43m of 225mm PVC
  • 1 x 2.5m – 3.5m deep Precast MH
  • 7 x 2.5m – 3.5m deep Insitu MHs
  • 6 x 3.5m – 4.5m deep Insitu MHs
  • 3 x Ventshafts
2006 - 2007
2006

Carter St, Homebush - Buildcorp Australia Pty Ltd

TYPE of WORK

Sewer Diversion

PIPE DETAIL

  • 230m of 225mm PVC
  • Construct 3 manholes
  •   229m microtunneling in clay/shale

Berkeley PVR Programme Networks Alliance

TYPE of WORK

PRV

PIPE DETAIL

  • 7 x Pressure Reducing Valves
  • 15 x Pressure  Monitoring Points
2006
2006

Middleton Grange. Hoxton Park Landcom

TYPE of WORK

Trunk Watermain Extension

This project had sensitive areas of Aboriginal and Environmental nature as follows:

  • 53m of Aboriginal site fenced off and not disturbed
  • 157m of line was monitored by an Archaelogist
  • 412m of line was sensitivity for local Aboriginal community. Maximum 5m working area and restricted machine movement.
  • 189m of line was environmentally sensitive. Maximum 5m working area and restricted machine movement

PIPE DETAIL

  • 30m of 660mm SCL
  • 240m of 520mm SCL
  • 68m of 419mm SCL
  • 13m of 600mm DICL K9
  • 2,586m of 450mm DICL K9
  • 19m of 375mm DICL K12
  • 1,291m of 375mm DICL K9
  • 16m of 200mm DICL K12

Lane Cove Tunnel Project – Taylors Lane Thiess John Holland Joint Venture

TYPE of WORK

Drainage

PIPE DETAI

  • 376m of 375mm to 2100mm
  • plus headwalls & pits to suit
  • 4 GPTs
  • Oil Containment Tank
2005
2005

Lane Cove Tunnel Project - Thiess John Holland Joint Venture

TYPE of WORK

Watermain

PIPE DETAL

  • 205m of 300mm PVC
  • 40m of 300mm SCL
  • 10m of 300mm DICL
  • Concrete encase 40m of 300mm pipeline

Lane Cove Tunnel Project – Epping Rd Case Nos: 72672PW & 72673PW - Thiess John Holland Joint Venture

TYPE of WORK

Watermain Adjustment

PIPE DETAIL

  • 300m of 100mm PVC
  • 105m of 150mm PVC
  • 20m of 100mm SCL
  • 160m of 150mm SCL
  • 345m of 250mm SCL
  • 28m of 750mm SCL
  • 110m of 100mm DICL
  • 5m of 200mm DICL
2005
2005

Parramatta Transport Interchange Ward Civil Engineering

TYPE of WORK

  • Stormwater
  • Watermain
  • Sewermain

PIPE DETAIL

  • 105m of 375mm RCP
  • 42m of 450mm RCP
  • 117m of 525 RCP
  • Construction of pits & gully pits
  • 60m of 100mm PVC
  • 195m of 150mm PVC
  • 60m of 200mm PVC
  • 66m of 150mm PVC

Parramatta Transport Interchange Ward Civil Engineering

TYPE of WORK

  • Stormwater
  • Watermain
  • Sewermain

PIPE DETAIL

  • 105m of 375mm RCP
  • 42m of 450mm RCP
  • 117m of 525 RCP
  • Construction of pits & gully pits
  • 60m of 100mm PVC
  • 195m of 150mm PVC
  • 60m of 200mm PVC
  • 66m of 150mm PVC
2005
2005

Camden Valley Way, Prestons Daracon Group

TYPE of WORK

Watermain Adjustment

PIPE DETAIL

  • 505m of 100mm PVC
  • 185m of 150mm PVC
  • 95m of 150mm DICL
  • 95m of 114mm SCL
  • 40m of 168mm SCL        

Yulong Estate, Moorebank – Stage 2 AWJ Earthmoving

TYPE of WORK

Sewer

PIPE DETAIL

  • 434m of 225mm PVC
  • 259m of 300mm PVC
  • 30m by Boring
2005
2004

Yulong Estate, Moorebank AWJ Earthmoving

TYPE of WORK

Sewer

PIPE DETAIL

  • 477m of 225mm UPVC
  • 810m of 375mm UPVC
  • 72m of 300mm UPVC
  • 162m of 450mm Hobas by microtunneling

Herbert St & Anzac Ave, West Ryde City of Ryde

TYPE of WORK

Sewer & Water

PIPE DETAIL

  • 10m of 150mm SCL
  • 15m of 150mm PVC
  • 25m of 100mm DICL
  • 22m of 750mm SCL
  • 6m of 500mm SCL
  • 3m of 500mm DICL
  • 6m of 300mm PVC
2004
2004

Hudson Street, Hurstville Hurstville City Council

TYPE of WORK

Drainage

PIPE DETAIL

  • 175m of 1050mm polyethylene
  • 22m of 450mm RC
  • Junction pits / Gully pits

 

Campbell & Morton Sts, Queanbeyan Greater Queanbeyan City Council

TYPE of WORK

Watermain Upgrade

PIPE DETAIL

  • 1,210m of 100mm DICL
2004
2004

Marrickville Drainage Marrickville Council

TYPE of WORK

Drainage

PIPE DETAIL

  • 32m of 600mm RCP
  • 23m of 525mm RCP
  • 43m of 450mm RCP
  • 12m of 375mm RCP
  • 20m of 450x225 RCBC Pits

Markham Close, Mosman Sydney Harbour Federation Trust

TYPE of WORK

Sewer, Water & Stormwater

PIPE DETAILS

  • 375m of 150mm PVC
  • 215m of 100mm PVC
  • 120m of 150mm PVC
  •   24m Under Road boring
2004
2004

Menangle Road, Menangle Park Root Projects Australia

TYPE of WORK

Watermain Amplification

PIPE DETAILS:

  • 1455m of 200mm PVC
  • 65m of 200mm DICL
  • 11m of 200mm SCL over aqueduct
  •  

Lucas Heights Athletic Field - Haslin Constructions

TYPE of WORK

Storm water

PIPE DETAILS:

  • 10m of 450mm FRC Class 4
  • 75m of 375mm FRC Class 4
  • 65m of 375mm FRC Class 2
  • 50m of 300mm Class 4
  • 170m of 300mm Class 2
  • 280m of 225mm Class 2
  • 55m of 150mm UPVC
  • 155m Ag line
  • 30 pits
  • 150mm and 300mm headwall
2004
2004

Forest Rd & Macpherson St, Warriewood - Rob Carr Pty Ltd

TYPE of WORK

Sewer

PIPE DETAILS:

  • 232m of 525mm GRP
  • 181m of 450mm GRP
  • 7 Manholes

 

Rookwood Necropolis

TYPE of WORK

Sewer & SPS

PIPE DETAILS:

  • 562m of 150mm uPVCP
  • 382m by Microtunnelling in Clay
  • 341m of 110mm PEP by Directional Drilling
  • 190m of 110mm PEP by Directional Drilling
  • 80m of 160mm PEP by Directional Drilling
  • 37m of 100mm uPVCP
  • 60m of 50mm uPVCP
  • 83m of 63mm and 40mm
  • Construct 7 Manholes
2003
2003

Morton St, Queanbeyan. Queanbeyan City Council

TYPE of WORK

Watermain & Services Upgrade

PIPE DETAILS:

  • 722m of 200mm DICL
  • 17m of 150mm DICL
  • 39m of 100mm DICL
  • 183m of under road boring for 1” copper pipe

Western Sydney International Dragway. John Holland Pty Ltd

TYPE of WORK

Water Service Deviation

Sewer Rising Main

SPS

PIPE DETAILS

  • 1900m of 150mm PVC
  • 400m of 100mm PVC
  • 2140m of 100mm MPVC
  • 97m of 125mm by Directional Drilling
  • 22.5m Under Road Boring
2003
2003

Henry Lawson Dr, Picnic Point. Bankstown City Council

TYPE of WORK

Drainage Works

PIPE DETAILS 

  • 332m of 575mm
  • 34m of 450mm
  • 32m of 325mm
  • 5 extended gully pits; 5 standard gully pits
  • 5 junction pits

Bangor Bypass Abigroup Contractors Pl Old Illawarra&Barden Rd Dulin Cl & Derrilin Cl North South Link Road Akuna Rd Bridge Shackel Rd Underpass Anzac Rd Barden Rd Carter Street Old Illawarra Rd, Menai

TYPE of WORK

Sewermain Adjustment

Watermain Adjustment

PIPE DETAILS

  • 116m of 300mm PVC
  • 17m of 300mm VCP
  • 149m of 225mm PVC
  • 81m of 200mm PVC
  • 10m of 600mm DICL
  • 110m of 250mm DICL
  • 70m of 200mm DICL
  • 40m of 650mm SCL
  • 76m of 273mm SCL
  • 5m of 600mm RC
  • 41m of 150mm DICL Thrust Bore
2003
Back To Top